| 32 |
Section 7.3.6 RA IP address entity configuration should be conditional |
|
Approval (Future Improvement) |
59 |
7.3.6 |
1 |
07 Aug 23 |
18 Oct 23 |
C. Gordon |
| 51 |
The certificate field corresponding to the AVL pinningId is not defined |
|
Approval (Editoral) |
74 |
7.8.5 |
1 |
14 Jul 24 |
03 Jan 25 |
C. Gordon |
| 61 |
Signature Algrothm for GDOI Push needs to be more explicit |
|
Approval (Editoral) |
98 |
8.6.1 |
2nd |
11 Oct 24 |
21 Oct 24 |
H. Falk |
| 103 |
X.509 Minimum Supported Size needs to be specified for GDOI |
|
Approval (Future Improvement) |
General |
Not relavent |
Not Relevant |
07 Feb 25 |
24 Mar 25 |
H. Falk |
| 104 |
Clarification of overlap of K0 and K1 |
|
Approval (Editoral) |
102 |
8.7 |
Unknown |
11 Feb 25 |
24 Mar 25 |
H. Falk |
| 107 |
CRL DP handling |
|
Approval (Future Improvement) |
64 |
7.4.4.10.9 |
2nd |
24 Mar 25 |
30 Jul 25 |
S. Fries |
| 108 |
Alignment for revoation handling of short term certificates for PK and A certificates |
|
Approval (Future Improvement) |
68 |
7.4.4.10.9 |
all |
11 Apr 25 |
18 Jun 25 |
S. Fries |
| 109 |
Security Warning handling in the absence of revocation information in PK certificates |
|
Approval (Future Improvement) |
73 |
7.4.4.10.9 + 7.4.4.10.10 |
all |
11 Apr 25 |
30 Jul 25 |
S. Fries |
| 111 |
MNEMONIC of Security Events |
|
Approval (Editoral) |
135 |
D4 |
Table D.3 |
21 May 25 |
18 Jun 25 |
S. Fries |
| 112 |
Include hint regarding formatting of URNs and URis |
|
Accepted |
61 ff |
7.4.4.6, 7.4.4.10.4 |
general |
16 Jun 25 |
30 Jul 25 |
S. Fries |
| 113 |
Availability of authorityInformationAccess in issued certificates |
|
Approval (Future Improvement) |
74 |
7.4.4.10.10 |
all |
18 Jun 25 |
30 Jul 25 |
S. Fries |
| 114 |
Enhanced recommendations for SAN |
|
Approval (Future Improvement) |
62 |
7.4.4.10.4 |
first |
25 Jun 25 |
30 Jul 25 |
S. Fries |
| 120 |
Typo in clause 8.3.4 |
|
Approval (Editoral) |
80 |
8.3.4 |
5 |
28 Jul 25 |
28 Jul 25 |
C. Cattaneo |
| 121 |
Typo in page 92 clause 8.5.7 for authentication algorithm name |
|
Conformance Test Verification |
92 |
8.5.7 |
item b) and c) |
30 Jul 25 |
15 Oct 25 |
C. Cattaneo |
| 122 |
Ambiguous reference to “Key Alg” at page 93 clause 8.5.8 |
|
Conformance Test Verification |
93 |
8.5.8 |
second bullet point in the page |
30 Jul 25 |
15 Oct 25 |
C. Cattaneo |
| 123 |
Clarification about HASH verification defined in clause 8.5.1 |
|
Discussion (red) |
84 |
8.5.1 |
3 and 4 |
30 Jul 25 |
18 Dec 25 |
C. Cattaneo |
| 124 |
Provide references in Table 3 for colum "Values" |
|
Approval (Editoral) |
76 |
8.2 |
Table 3 |
31 Jul 25 |
25 Aug 25 |
C. Cattaneo |
| 125 |
Figure 24 Phase 1 Informational Exchange |
|
Approval (Editoral) |
82 |
Figure 24 |
Figure 24 |
01 Aug 25 |
18 Dec 25 |
C. Cattaneo |
| 126 |
Provide indication of the field size for the ID_OID Identification Data fields |
|
Approval (Editoral) |
87 |
8.5.5.2.2 |
1st and 2nd bullet point |
01 Aug 25 |
25 Aug 25 |
C. Cattaneo |
| 128 |
KDA provided from GM to KDC to acknowledge receiving updated keying material in a GOUPKEY-PULL excha |
|
Approval (Editoral) |
102 |
8.7.4 |
3rd (first bullet point) |
18 Aug 25 |
18 Dec 25 |
C. Cattaneo |
| 133 |
Alignment on extendedKeyUsage (condiional/optional) |
|
Approval (Editoral) |
64 |
7.4.4.10.7 |
1 |
24 Oct 25 |
24 Oct 25 |
S. Fries |
| 134 |
Add note that keyUsage should be treated as mandatory and critical |
|
Approval (Future Improvement) |
74 |
7.4.4.10.6 |
End |
24 Oct 25 |
24 Oct 25 |
S. Fries |
| 138 |
Clarification - KDA behavior need to gate on enable rather than supported |
|
Approval (N/A) |
- |
8.5.10.3 |
1 |
05 Dec 25 |
08 Jan 26 |
J. Greene |
| 147 |
GROUP-PUSH Header.Length value |
|
Triage |
98 |
8.6.1 |
1 |
23 Jan 26 |
|
H. Falk |